The industrial enterprise sells gas turbines OPRA OP16-ZA without operating time, from safe storage.
Power is 1.85 MW.
These turbines are from the moment of production at the manufacturer's warehouse in Europe.
Once a year, storage extension works are performed on them.
The turbines were produced from November 2012 to January 2013.
Sale 30% below catalog price.
The gas turbines are equipped with 0.4 kV (50 Hz) Leroy Somer generators.
The turbines are designed to be housed in an easily prefabricated shelter.
If necessary, in the course of pre-sale preparation, the GTU block module can be modified for outdoor operation.
It is possible to additionally equip these gas turbines with waste-heat boilers with a capacity of 5.6 tons / hour.
We can also supply boilers in container design.
For the operation of the GTU, a fuel gas with a pressure of 1.2 MPa is required.
Completion of the offered gas turbines - send on request.
Specification of the proposed GTU - send on request.
We work with customers from any country in the world.
All questions will be answered by a consulting engineer.
Please contact by WhatsApp +79788975009 or Telegram +380968491702