205 MW SGT800 complete combined cycle power plant
Информация может быть не достоверна

Installed Capacity - 205 MW. Energy Generation Capacity - 1640 GWh/year. Commissioning Date - 16.06.2013. Configuration - 3 X SGT-800 GT + 1 x ST. 50hz.

Installed Capacity - 205 MW.
Energy Generation Capacity - 1640 GWh/year.
Commissioning Date - 16.06.2013.
Configuration - 3 X SGT-800 GT + 1 x ST. 50hz.
Total Gross Efficiency/Net Efficiency - 55% / 53.6%.
The Power Plant is composed of 3 nos of Gas Turbines (Siemens SGT-800) and 1 no of Steam Turbine (Siemens SST-900), 3 nos of HRSG (Aalborg- Denmark), 1 no of ACC (SPX-Belgium), 1 no of RMS station, HV switchyard and BOP equipment.
The generated electricity is transmitted to high voltage Switchyard through 28 km of 154 kV 2x1272 MCM overhead transmission line.
The plant was commissioned as simple cycle in August 2012 and as combined cycle in June 2013. 
20,000 working hours.
This factory is in excellent condition, energized and maintained in accordance with OEM directives.

I will provide additional information upon request.
The plant is available for inspection by qualified buyers who have proven financial resources and a fully approved project.
All technical details, including maintenance records, will be provided during inspection.
We provide services for troubleshooting gas turbines, conducting inspections, major repairs, refurbishment.
Please contact our engineers and consultants on WhatsApp +79788975009 or Telegram +380968491702

посмотреть все (203)

Другие товары и услуги компании:

Installation, configuration and start-up power plants Ruston SGT-200
Информация может быть не достоверна
Installation, configuration and commissioning of gas turbine power plants Siemens (Ruston) SGT-200 with a capacity of 6.5 MW.
Installation and start-up of gas turbine engines at power plants Installation and start-up of gas turbine engines at power plants
Информация может быть не достоверна
The company has many years of experience in servicing gas turbine engines used in large and small power plants.
4 500 000 тг.
Dismantling, installation, start-up of Siemens SGT100 power plants
Информация может быть не достоверна
The gas turbine engine service company provides services all over the world. Decommissioning, dismantling, transportation, installation, start-up of Siemens SGT100 power plants.
Spare parts and components for steam turbines and thermal power plants Spare parts and components for steam turbines and thermal power plants
Информация может быть не достоверна
Selling spare parts for steam turbines and thermal power plants. We will manufacture components for domestic and imported steam turbines and thermal power plants.
123 000 тг.
Inspection A of the gas turbine power plant SGT-400 Inspection A of the gas turbine power plant SGT-400
Информация может быть не достоверна
An industrial enterprise produces: Maintenance (Inspection "A") of the gas turbine power station SGT-400 Siemens.
5 500 000 тг.
Inspection A of the gas turbine power plant SGT-600 Inspection A of the gas turbine power plant SGT-600
Информация может быть не достоверна
An industrial enterprise produces: Maintenance (Inspection "A") of the gas turbine power station SGT-600 Siemens.
6 500 000 тг.
Информация о продавце
Ремонт газовых турбин Siemens, Rolls-Royce Avon. Изготовление испытательных стендов. Продажа запчастей для газовых турбин Siemens, Rolls-Royce Avon.
×